MCT-2026-MEP-001
Marina Commercial Tower
One test project, every engine: 20 issued reports from the 19 tools, each with its Word and Excel files.
HVAC & Ventilation

850,041 L / year
Condensate Simulation Report
Hourly coil yield, Dubai weather, reuse tank

17,691 m³/h airflow
Substation Ventilation Report
Forced ventilation airflow from the DBC nomogram, SS01

47 air systems · 142 units selected
HAP Extractor and FCU Selection Workbooks
Carrier HAP test print to a formatted load and selection workbook

173.7 kW heating equipment
Swimming Pool Load Report
Evaporation, heating and dehumidification for pool PL01

6,220 L/s fresh air
Fresh Air Calculation, FAHU-01
Space-by-space outdoor air rolled up to the FAHU

246,950 kWh / year cooling
Ventilation Energy Consumption, FAHU-01
Hourly fresh-air cooling energy and annual cost

199.9 Pa fan static at 6,220 L/s
Static Regain Duct Sizing, FAHU-01
Supply duct network sized section by section

1,500 L vessel (1,394.4 L minimum)
Pressurization and Expansion Vessel, EV01
Sealed-system vessel sizing and fill pressures

2.09 m³/s exhaust
Kitchen Hood Extract, KH01
Preliminary exhaust flow for a kitchen hood
Plumbing & Water

26.43 L/s design flow
Water Supply: IPC Fixture Units
Hunter-curve demand, IPC 2021 Table E103.3

1.20 × 1.50 × 1.45 m pit
Sump Pit Sizing Calculation
Active volume from motor start-frequency limits

18.88 L/s · DN 150 stack
Soil Stack Sizing, SS01
Design flow by the discharge-unit method, stack and vent sizes

2.604 L/s product flow
Water Treatment Scheme, WT01
Treatment train, product flow and equipment

128.40 m³/h design flow
Pool Equipment Sizing
Circulation, filtration and plant sizing
Fire, Gas & Life Safety

10,075 L/s fan flow
Stairwell Pressurization Report
Zone 1 of 2 (GF to L20), door force 125 N against 133 N

2,827 persons · 1,056 mm stair egress width
Occupant Load and Egress
Occupant load and egress capacity for the tower

117.33 kg · 1 cylinder
Clean Agent System: NFPA 2001 Sizing
One room, FK-5-1-12, one cylinder

295 L concentrate
Foam System, Dike DB01
Foam solution rate and concentrate quantity

4 × 1,000 US gal · 7.8 days
LPG Supply System
Demand, tank combination, autonomy and pipe sizing
Electrical
Founding seats
Try it free for 7 days. Founding seats: $15/month for 3 months, then $39 — or $350/year.
Windows 10/11 wrapper. Pick the tools you need. Nothing charged during the 7-day trial.